Hongsheng Union - Company A micro-small parts processing company profile: My company's turning milling compound machine introduced the advanced equipment of Japan, they are turning milling compound machine tools that can automatically feed.These equipment can be processed in bulk precision shaft products, with high efficiency, high quality, low cost advantages.Some products need to be in the CNC lathe after a number of procedures to complete, in our company'sautomatic turning and milling compound machine can be completed at a time, so that the quality of products will be more stable.Each person can operate up to 2 sets of CNC lathes, but our automaticturning and milling processing equipment per person can operate up to 10 sets, which greatly reduces labor costs.The company has a total of more than 100 sets of equipment, which can meet the needs of different customers mass production of precision shaft products. |
Tsugami turning-milling machine 44 sets. Including one set model 265, one set model 204,one set model 385,two sets model 125,twentyone sets model 205,eighteen sets model 16.the stroke of our machine can reach below 38mm. |
I.Test in production At the time of initial production, the top 10 products, all sizes of each product must be tested. inspecting 50 pieces or 100 pieces of sampling after debugging II. test on finished parts before shipping 1.In principle, each product must be tested on where there are strict tolerances on the drawing. Spot check shall be carried out where there is no tolerance requirement | |||||
Use packing bags | ||||||
Use blow molding boxes |
DHL/UPS/FEDEX/TNT/OCS are shipped by default. If the customer has demand, We can also choose express delivery according to customers' requirements. Generally, it takes 3 days to send the express to Japan, and 4-5 days to Europe and America. This is mainly for small pieces (within 300kg). For large parts, we will use air or sea transportation according to customers' requirements. Generally, it takes 4-5 days to ship to Japan by air and 7-10 days to ship by sea. It takes 7-10 days to ship the goods by air in Europe and America, and 15-20 days to ship the goods by sea. |